Piping System: KemPress Stainless Steel
Project: Hot Water Ring Main Pipe Replacement
Client: ANZCO Rakaia
Completed: July 2015
ANZCO Foods Rakaia needed to replace their leaking hot water ring main pipe work, along with laterals which supplied various lines throughout the plant. The project presented a number of challenges to their engineering team who would undertake the work.